简介概要

DISCUSSIONS ON DETERMINATION OF THE OPTIMUM PRODUCTION RATE AND LIFE OF THE UNDERGROUND MINE

来源期刊:Journal Of Wuhan University Of Technology Materials Science Edition1995年第2期

论文作者:任毅 祖占良 冯仲仁

文章页码:51 - 57

摘    要:<正>A very popular poinl of view on the,production rate of mining mineral resources has beenheld for long time; that is.if the market price is static.the function of discount rate makes an optimum production rate decrease with the time. The point is proved incorrect by the author through a detail study on the rela-tionship between the operation costs and the productionrate by using several different mathematics mathods.Al-so a new mathematic model of searching for optimumproduction rate and mine life in the underground is inculded, which is more practical in application.

详情信息展示

DISCUSSIONS ON DETERMINATION OF THE OPTIMUM PRODUCTION RATE AND LIFE OF THE UNDERGROUND MINE

任毅,祖占良,冯仲仁

摘 要:<正>A very popular poinl of view on the,production rate of mining mineral resources has beenheld for long time; that is.if the market price is static.the function of discount rate makes an optimum production rate decrease with the time. The point is proved incorrect by the author through a detail study on the rela-tionship between the operation costs and the productionrate by using several different mathematics mathods.Al-so a new mathematic model of searching for optimumproduction rate and mine life in the underground is inculded, which is more practical in application.

关键词:

<上一页 1 下一页 >

有色金属在线官网  |   会议  |   在线投稿  |   购买纸书  |   科技图书馆

中南大学出版社 技术支持 版权声明   电话:0731-88830515 88830516   传真:0731-88710482   Email:administrator@cnnmol.com

互联网出版许可证:(署)网出证(京)字第342号   京ICP备17050991号-6      京公网安备11010802042557号