Sand deposit-detecting method and its application in model test of sand flow
来源期刊:中南大学学报(英文版)2013年第10期
论文作者:LI Wei(黎伟) FANG Ying-guang(房营光) MO Hai-hong(莫海鸿) GU Ren-guo(谷任国) CHEN Jun-sheng(陈俊生)
文章页码:2840 - 2848
Key words:immersed tube tunnel; foundation treatment; model test of sand-flow method; sand deposit detecting; structural characteristics of sand-deposit
Abstract: Against the background of the sand-flow foundation treatment engineering of Guangzhou Zhoutouzui variable cross-section immersed tunnel, a kind of sand deposit-detecting method was devised on the basis of full-scale model test of sand-flow method. The real-time data of sand-deposit height and radius were obtained by the self-developed sand-deposit detectors. The test results show that the detecting method is simple and has high precision. In the use of sand-flow method, the sand-carrying capability of fluid is limited, and sand particles are all transported to the sand-deposit periphery through crater, gap and chutes after the sand deposit formed. The diffusion range of the particles outside the sand-deposit does not exceed 2.0 m. Severe sorting of sand particles is not observed because of the unique oblique-layered depositing process. The temporal and spatial distributions of gap and chutes directly affect the sand-deposit expansion, and the expansion trend of the average sand-deposit radius accords with quadratic time-history curve.
LI Wei(黎伟)1, 2, FANG Ying-guang(房营光)1, 2, MO Hai-hong(莫海鸿)1, 2, GU Ren-guo(谷任国)1, 2, CHEN Jun-sheng(陈俊生)1, 2
(1. School of Civil Engineering and Transportation, South China University of Technology, Guangzhou 510640, China;
2. State Key Laboratory of Subtropical Building Science (South China University of Technology),
Guangzhou 510640, China)
Abstract:Against the background of the sand-flow foundation treatment engineering of Guangzhou Zhoutouzui variable cross-section immersed tunnel, a kind of sand deposit-detecting method was devised on the basis of full-scale model test of sand-flow method. The real-time data of sand-deposit height and radius were obtained by the self-developed sand-deposit detectors. The test results show that the detecting method is simple and has high precision. In the use of sand-flow method, the sand-carrying capability of fluid is limited, and sand particles are all transported to the sand-deposit periphery through crater, gap and chutes after the sand deposit formed. The diffusion range of the particles outside the sand-deposit does not exceed 2.0 m. Severe sorting of sand particles is not observed because of the unique oblique-layered depositing process. The temporal and spatial distributions of gap and chutes directly affect the sand-deposit expansion, and the expansion trend of the average sand-deposit radius accords with quadratic time-history curve.
Key words:immersed tube tunnel; foundation treatment; model test of sand-flow method; sand deposit detecting; structural characteristics of sand-deposit