Cost-benefit timing for applying slurry seal on actual roadway tests in China

来源期刊:中南大学学报(英文版)2012年第8期

论文作者:支喜兰 王威娜 蔡宜长

文章页码:2394 - 2402

Key words:preventive maintenance; evaluation system; cost-benefit timing; slurry seal

Abstract: Determining the optimal timing is the core of preventive maintenance. Highway agencies always face with the challenge of determining optimal timing for preventive maintenance, particularly in China where there are no condition indicators designed for determining adequate timing for applying preventive maintenance and little literature relating to the development of pavement performance. This work presented the indicators, including crack ratio (RC), rutting depth (DR), international roughness index (IIR) and sideway force coefficient (CSF) to determine the adequate timing for preventive maintenance in China. The proper ranges of each indicator to apply to preventive maintenance were then recommended. They are 0.28%-1.4% for RC, 10-15 mm for DR, 1.97-3.5 for IIR, 40-50 for CSF. Based on pavement condition survey data collected on the test roads in Hebei Province, China, on the application of slurry seal at different timings, the pavement performance was established and the adequate timings for applying slurry seal was studied. Based on benefit-cost analysis, it is suggested that the fourth year is the optimal timing for applying slurry seal based on the condition in China. A framework is established to determine the adequate timings of applying other preventive maintenance methods.

有色金属在线官网  |   会议  |   在线投稿  |   购买纸书  |   科技图书馆

中南大学出版社 技术支持 版权声明   电话:0731-88830515 88830516   传真:0731-88710482   Email:administrator@cnnmol.com

互联网出版许可证:(署)网出证(京)字第342号   京ICP备17050991号-6      京公网安备11010802042557号