简介概要

A fast explicit finite difference method for determination of wellhead injection pressure

来源期刊:中南大学学报(英文版)2012年第11期

论文作者:BAI Bing(白冰) LI Xiao-chun(李小春) LIU Ming-ze(刘明泽) SHI Lu(石露) Li Qi(李琦)

文章页码:3266 - 3272

Key words:wellhead pressure; injection pressure; bottom-hole pressure; fast explicit finite difference method

Abstract: A fast explicit finite difference method (FEFDM), derived from the differential equations of one-dimensional steady pipe flow, was presented for calculation of wellhead injection pressure. Recalculation with a traditional numerical method of the same equations corroborates well the reliability and rate of FEFDM. Moreover, a flow rate estimate method was developed for the project whose injection rate has not been clearly determined. A wellhead pressure regime determined by this method was successfully applied to the trial injection operations in Shihezi formation of Shenhua CCS Project, which is a good practice verification of FEFDM. At last, this method was used to evaluate the effect of friction and acceleration terms on the flow equation on the wellhead pressure. The result shows that for deep wellbore, the friction term can be omitted when flow rate is low and in a wide range of velocity the acceleration term can always be deleted. It is also shown that with flow rate increasing, the friction term can no longer be neglected.

详情信息展示

A fast explicit finite difference method for determination of wellhead injection pressure

BAI Bing(白冰), LI Xiao-chun(李小春), LIU Ming-ze(刘明泽), SHI Lu(石露), Li Qi(李琦)

(State Key Laboratory of Geomechanics and Geotechnical Engineering (Institute of Rock and Soil Mechanics,
Chinese Academy of Sciences), Wuhan 430071, China)

Abstract:A fast explicit finite difference method (FEFDM), derived from the differential equations of one-dimensional steady pipe flow, was presented for calculation of wellhead injection pressure. Recalculation with a traditional numerical method of the same equations corroborates well the reliability and rate of FEFDM. Moreover, a flow rate estimate method was developed for the project whose injection rate has not been clearly determined. A wellhead pressure regime determined by this method was successfully applied to the trial injection operations in Shihezi formation of Shenhua CCS Project, which is a good practice verification of FEFDM. At last, this method was used to evaluate the effect of friction and acceleration terms on the flow equation on the wellhead pressure. The result shows that for deep wellbore, the friction term can be omitted when flow rate is low and in a wide range of velocity the acceleration term can always be deleted. It is also shown that with flow rate increasing, the friction term can no longer be neglected.

Key words:wellhead pressure; injection pressure; bottom-hole pressure; fast explicit finite difference method

<上一页 1 下一页 >

有色金属在线官网  |   会议  |   在线投稿  |   购买纸书  |   科技图书馆

中南大学出版社 技术支持 版权声明   电话:0731-88830515 88830516   传真:0731-88710482   Email:administrator@cnnmol.com

互联网出版许可证:(署)网出证(京)字第342号   京ICP备17050991号-6      京公网安备11010802042557号