简介概要

Evaluation of boring machine performance with special reference to geomechanical characteristics

来源期刊:International Journal of Minerals Metallurgy and Materials2009年第6期

论文作者:K. Goshtasbi M. Monjezi P. Tourgoli

文章页码:615 - 619

摘    要:The duration of tunneling projects mostly depends on the performance of boring machines. The performance of boring machines is a function of advance rate, which depends on the machine characterizations and geomechanical properties of rock mass. There were various theoretical and empirical models for estimating the advance rate. In this paper, after determining the geome-chanical properties of rock mass encountered in the Isfahan metro tunnel, the performance of the roadheader and tunnel boring ma-chine (TBM) were then evaluated using various models. The calculation results show that the average instantaneous cutting rate of the roadheader in sandstone and shale are 42.8 and 74.5 m3/h respectively. However the actual values in practice are 34.2 and 51.3 m3/h. The operational cutting rate of the roadheader in sandstone and shale are 8.2 and 9.7 m3/h respectively, but the actual values are 6.5 and 6.7 m3/h. The penetration rate of the TBM in shale is predicted to be 50-60 mm/round.

详情信息展示

Evaluation of boring machine performance with special reference to geomechanical characteristics

K. Goshtasbi,M. Monjezi,P. Tourgoli

Faculty of Engineering, Tarbiat Modares University

摘 要:The duration of tunneling projects mostly depends on the performance of boring machines. The performance of boring machines is a function of advance rate, which depends on the machine characterizations and geomechanical properties of rock mass. There were various theoretical and empirical models for estimating the advance rate. In this paper, after determining the geome-chanical properties of rock mass encountered in the Isfahan metro tunnel, the performance of the roadheader and tunnel boring ma-chine (TBM) were then evaluated using various models. The calculation results show that the average instantaneous cutting rate of the roadheader in sandstone and shale are 42.8 and 74.5 m3/h respectively. However the actual values in practice are 34.2 and 51.3 m3/h. The operational cutting rate of the roadheader in sandstone and shale are 8.2 and 9.7 m3/h respectively, but the actual values are 6.5 and 6.7 m3/h. The penetration rate of the TBM in shale is predicted to be 50-60 mm/round.

关键词:

<上一页 1 下一页 >

相关论文

  • 暂无!

相关知识点

  • 暂无!

有色金属在线官网  |   会议  |   在线投稿  |   购买纸书  |   科技图书馆

中南大学出版社 技术支持 版权声明   电话:0731-88830515 88830516   传真:0731-88710482   Email:administrator@cnnmol.com

互联网出版许可证:(署)网出证(京)字第342号   京ICP备17050991号-6      京公网安备11010802042557号