简介概要

Replenishment policy and inventory optimization for supply-hub with liability period consideration

来源期刊:中南大学学报(英文版)2013年第10期

论文作者:LI Guo(李果) HUANG Kun(黄焜) YAO Qi(姚琦) MA Shi-hua(马士华)

文章页码:2914 - 2921

Key words:liability period; supply-hub; replenishment policy; inventory optimization; lead time

Abstract: A replenishment decision-making model for supply-hub is firstly established from the angle of supplier, and optimal replenishment decision of the supplier is analyzed. Then, inventory optimization model for supply-hub is formulated from the angle of the manufacturer, and the optimization algorithm for obtaining optimal inventory levels is given. The result shows that liability period decides the share of the inventory cost between two sides in supply chain. With the increase of liability period, the service level has been quickly reduced even though the manufacturer’s cost has been cut down by transferring the inventory cost to the supplier. As to the safety inventory, if the lower bound of components safety inventory increases, the supplier’s cost will rise up more slowly than the liability period does, while the service levels increases as the safety inventory’s lower bound is raised.

详情信息展示

Replenishment policy and inventory optimization for supply-hub with liability period consideration

LI Guo(李果) 1, HUANG Kun(黄焜)2, YAO Qi(姚琦)3, MA Shi-hua(马士华)2

(1. School of Management and Economics, Beijing Institute of Technology, Beijing 100081, China;
2. School of Management, Huazhong University of Science and Technology, Wuhan 430074, China;
3. College of Finance and Economics, Chongqing Jiaotong University, Chongqing 400074, China)

Abstract:A replenishment decision-making model for supply-hub is firstly established from the angle of supplier, and optimal replenishment decision of the supplier is analyzed. Then, inventory optimization model for supply-hub is formulated from the angle of the manufacturer, and the optimization algorithm for obtaining optimal inventory levels is given. The result shows that liability period decides the share of the inventory cost between two sides in supply chain. With the increase of liability period, the service level has been quickly reduced even though the manufacturer’s cost has been cut down by transferring the inventory cost to the supplier. As to the safety inventory, if the lower bound of components safety inventory increases, the supplier’s cost will rise up more slowly than the liability period does, while the service levels increases as the safety inventory’s lower bound is raised.

Key words:liability period; supply-hub; replenishment policy; inventory optimization; lead time

<上一页 1 下一页 >

相关论文

  • 暂无!

相关知识点

  • 暂无!

有色金属在线官网  |   会议  |   在线投稿  |   购买纸书  |   科技图书馆

中南大学出版社 技术支持 版权声明   电话:0731-88830515 88830516   传真:0731-88710482   Email:administrator@cnnmol.com

互联网出版许可证:(署)网出证(京)字第342号   京ICP备17050991号-6      京公网安备11010802042557号