New mining technique with big panels and stopes in deep mine

来源期刊:中国有色金属学报(英文版)2008年第1期

论文作者:王贻明 吴爱祥 陈学松 杨保华 苏永定

文章页码:183 - 189

Key words:deep well; high initial stress; stoping scheme; optimization

Abstract: For the purpose to suit the bad mining technical conditions, such as deep imbed, gentle dip angle, and high initial stress in Dongguashan deposit, the stoping scheme was optimized. The new mining technique, with temporary curtain walls, large panels and stopes, was achieved as well. The deposit model, which was built through the DATAMINE, was led into FLAC3D for numerical simulation. Based on these, the stabilities of pillars and stopes were analyzed. On the other hand, the impact of output stability by new scheme was verified with the help of optimization planning theory. The results show that stopes and curtain walls are safe when the width of temporary curtain walls between panels are 18 m. The length and width of stope increase to 78 m (82 m) and 18 m respectively, and those of panel increase to 300-500 m and 100 m respectively. The commercial test indicates that the new scheme can attain the aims of simpler production organization, better stope ventilation and work condition, smaller quantities of development and cutting, and 2/3 of equipments as before with the stable output. The pillar stoping technique is credible and valuable.

基金信息:Key Technology Research and Development Program of China
the National Natural Science Foundation of China

相关论文

  • 暂无!

相关知识点

  • 暂无!

有色金属在线官网  |   会议  |   在线投稿  |   购买纸书  |   科技图书馆

中南大学出版社 技术支持 版权声明   电话:0731-88830515 88830516   传真:0731-88710482   Email:administrator@cnnmol.com

互联网出版许可证:(署)网出证(京)字第342号   京ICP备17050991号-6      京公网安备11010802042557号