简介概要

STUDY ON GREY FORECASTING MODEL OF COPPER EXTRACTION RATE WITH BIOLEACHING OF PRIMARY SULFIDE ORE

来源期刊:Acta Metallurgica Sinica2007年第2期

论文作者:H.C. Jiang B.H. Yang A.X. Wu Y. Xi X.S. Chen

Key words:primary copper sulfide ore; bioleaching; extraction rate; grey theory; forecasting model;

Abstract: A model GM (grey model) (1,1) for forecasting the rate of copper extraction during the bioleaching of primary sulphide ore was established on the basis of the mathematical theory and the modeling process of grey system theory. It was used for forecasting the rate of copper extraction from the primary sulfide ore during a laboratory microbial column leaching experiment. The precision of the forecasted results were examined and modified via "posterior variance examination". The results show that the forecasted values coincide with the experimental values. GM (1,1) model has high forecast accuracy; and it is suitable for simulation control and prediction analysis of the original data series of the processes that have grey characteristics, such as mining, metallurgical and mineral processing, etc. The leaching rate of such copper sulphide ore is low. The grey forecasting result indicates that the rate of copper extraction is approximately 20% even after leaching for six months.

详情信息展示

STUDY ON GREY FORECASTING MODEL OF COPPER EXTRACTION RATE WITH BIOLEACHING OF PRIMARY SULFIDE ORE

H.C. Jiang1,B.H. Yang1,A.X. Wu2,Y. Xi3,X.S. Chen1

(1.School of Resources & Safety, Central South University, Changsha 410083, China;
2.Givil & Engineering School, University of Science and Technology Beijing, Beijing 100083, Ghina;
3.China Nonferrous Engineering and Research Institute, Beijing 100038, China)

Abstract:A model GM (grey model) (1,1) for forecasting the rate of copper extraction during the bioleaching of primary sulphide ore was established on the basis of the mathematical theory and the modeling process of grey system theory. It was used for forecasting the rate of copper extraction from the primary sulfide ore during a laboratory microbial column leaching experiment. The precision of the forecasted results were examined and modified via "posterior variance examination". The results show that the forecasted values coincide with the experimental values. GM (1,1) model has high forecast accuracy; and it is suitable for simulation control and prediction analysis of the original data series of the processes that have grey characteristics, such as mining, metallurgical and mineral processing, etc. The leaching rate of such copper sulphide ore is low. The grey forecasting result indicates that the rate of copper extraction is approximately 20% even after leaching for six months.

Key words:primary copper sulfide ore; bioleaching; extraction rate; grey theory; forecasting model;

【全文内容正在添加中】

<上一页 1 下一页 >

相关论文

  • 暂无!

相关知识点

  • 暂无!

有色金属在线官网  |   会议  |   在线投稿  |   购买纸书  |   科技图书馆

中南大学出版社 技术支持 版权声明   电话:0731-88830515 88830516   传真:0731-88710482   Email:administrator@cnnmol.com

互联网出版许可证:(署)网出证(京)字第342号   京ICP备17050991号-6      京公网安备11010802042557号