宝钢1#连铸机及KIP/CAS三电系统改造

来源期刊:冶金自动化2009年第1期

论文作者:章建雄 朱杰 周建平

文章页码:21 - 25

关键词:连铸机; 三电系统; 在线改造; 网关; 通信网络

Key words:continuous casting; EIC system; online revamping; gate way; communication network

摘    要:针对宝钢1#连铸机及K IP/CAS三电系统原有设备老化、备件无法供应、维护与故障分析处理困难等问题进行改造。改造采用了离线仿真、并行运行等技术,解决了共用系统在线改造、不同系统间通信协议以及新旧系统共存等难题。本次改造由宝钢自主完成三电控制系统的系统集成、调试与热负荷试车,并取得了系统改造投运后当月达产的良好效果。

Abstract: For EIC system of No.1 CCM and KIP/CAS in Baosteel,the original system equipment is aging,no more spare parts can be supplied,and maintenance of system and analysis treatment of fault were difficult,so that revamping should be carried out.Off-line simulation and parallel operation techniques were adopted in this revamping.Difficult problems including common system on-line revamping,communication protocol between different systems,and integration of old devices and new control system after revamping etc.have been solved.System integration,commission and startup of EIC control system were independently achieved by Baosteel.After revamping,No.1 CCM reaches output target in the first month.

详情信息展示

宝钢1#连铸机及KIP/CAS三电系统改造

章建雄1,朱杰1,周建平1

(1.上海市宝山钢铁股份有限公司宝钢分公司炼钢厂)

摘 要:针对宝钢1#连铸机及K IP/CAS三电系统原有设备老化、备件无法供应、维护与故障分析处理困难等问题进行改造。改造采用了离线仿真、并行运行等技术,解决了共用系统在线改造、不同系统间通信协议以及新旧系统共存等难题。本次改造由宝钢自主完成三电控制系统的系统集成、调试与热负荷试车,并取得了系统改造投运后当月达产的良好效果。

关键词:连铸机; 三电系统; 在线改造; 网关; 通信网络

<上一页 1 下一页 >

有色金属在线官网  |   会议  |   在线投稿  |   购买纸书  |   科技图书馆

中南大学出版社 技术支持 版权声明   电话:0731-88830515 88830516   传真:0731-88710482   Email:administrator@cnnmol.com

互联网出版许可证:(署)网出证(京)字第342号   京ICP备17050991号-6      京公网安备11010802042557号